Compost Preparation

Compost Unit Specs

Engineered systems for optimized Phase-I & Phase-II cycles.

Bunker Dimensions

Spatial configuration for aeration.

  • 2000-Bag Unit (20T):
    14 x 30 ft System
  • 3000-Bag Unit (30T):
    14 x 40 ft System

Cycle Timelines

Strict 15-day composting workflow.

  • Phase-I: 8 days (Conditioning & pre-wet)
  • Phase-II: 7 days (Pasteurization & conditioning)

Required Machinery Config

Industrial-grade equipment included in the turnkey cost.

Centrifugal Blowers

High-capacity grided floor aeration system ensuring proper O2 penetration during Phase-II pasteurization phase.

Precision Thermosensors

Automated multipoint probing sensors linking directly to climate panels to monitor 57-60°C peak-heating thresholds.

Start Building Your Compost Unit

Skip the trial-and-error. Deploy proven infrastructure designed for large-scale mushroom farming success.

Get a Quote
Chat on WhatsApp