Compost Preparation
Compost Unit Specs
Engineered systems for optimized Phase-I & Phase-II cycles.
Bunker Dimensions
Spatial configuration for aeration.
- 2000-Bag Unit (20T):14 x 30 ft System
- 3000-Bag Unit (30T):14 x 40 ft System
Cycle Timelines
Strict 15-day composting workflow.
- Phase-I: 8 days (Conditioning & pre-wet)
- Phase-II: 7 days (Pasteurization & conditioning)
Required Machinery Config
Industrial-grade equipment included in the turnkey cost.
Centrifugal Blowers
High-capacity grided floor aeration system ensuring proper O2 penetration during Phase-II pasteurization phase.
Precision Thermosensors
Automated multipoint probing sensors linking directly to climate panels to monitor 57-60°C peak-heating thresholds.
Start Building Your Compost Unit
Skip the trial-and-error. Deploy proven infrastructure designed for large-scale mushroom farming success.
Get a Quote